expand your equestrian business online

Get your website up running within minutes and manage everything from a ready-built dashboard — without needing to involve developers.

Join the team!

Join the team!

⭐️2 new positions are becoming available to join our existing team from the 31.5.24⭐️

Position 1 - Experienced Home Groom

Position 2 - Home Rider / Groom

Please get in touch if you consider yourself a candidate or PM us for ⤵️

We look forward to hearing from you 😊
📞 Kendall ~ 07530 803987
📞Alex ~ 07787 575804

✉️ [email protected]
🌐 www.hempleman-equestrian.com

Show Report: Sentower Park - CSI

Show Report: Sentower Park - CSI

We had an enjoyable trip to Sentower Park last week with 5 of our up and coming young horses. Having spent the last 6 months back in the UK producing the horses over the winter months it was nice to get a gauge on their progress.

5yo Thor van de Vlasbloemhoeve impressed with placings each day, clear on the first 2 days picking up a 5th and 3rd place respectively. And just showed a little inexperience changing rings for the final day, but finished the course well to pick up eventual 10th place.
6yos Nevis Field & Loma de Reve LH posted very solid rounds in the large Ashford Arena each day including a 7th place on day 1. An unfortunate fence down around a tough Grand Prix course kept them both out of the jump off but we are excited for the rest of the year with them.
And finally 7yos Malibu RAG & Mowgli C really stepped up jumping 2/3 clears in their 1m30-1m35 classes also picking up 2 placings over the weekend. An unlucky fault at the end of their testing 7yo final also kept them both out of the jump off this time but we feel a lot of experience was gained for them.

Great to have been joined by our friend Carolyn Curcio from Chiron Stables this week too, with her two horses gaining valuable experience for the rest of the year as well.

Work Completed By : B&M Contracting

Work Completed By : B&M Contracting

We are delighted with all of the work that B&M have undertaken for us.

From a small roof replacement on our outdoor stables consisting of replacing the old tin roof with new insulated roof sheets with roof lights to the whole groundwork project for the lunge arena.

For the lunge arena there was a large amount of clay to be removed from the site before concrete foundations were laid, as well as adding drainage around the area and linking into the existing horse walker drainage which was also part of a previous job.

After the building was erected by Molenkoning UK all of the sand moving and levelling was also completed including the path leading up to the arena and all of the final landscaping.

Other jobs include concrete screeds and a concrete ramp leading into the outdoor stables.

We look forward to continuing to work with B&M on our future projects and upgrades to the farm.